PROJECT PORTFOLIO
List of Completed Assignments
Our experience covers renewable energy, engineering, infrastructure development, energy planning, water supply, irrigation and related consulting services.
Showing
41
-
59
of
59
projects
| S.N. | NAME OF ASSIGNMENT | PERIOD | LOCATION | CLIENT | DESCRIPTION OF WORK CARRIED OUT |
|---|---|---|---|---|---|
| 41 | Preparation District Energy Plan of Gorkha, Palpa, Rupandehi, Kapilbastu, Syangja, Arghakhanchi, Baglung, Parbat, Kaski and Manang districts | 5th October 2015- 4th April 2016 | Gorkha, Palpa, Rupandehi, Kapilbastu, Syangja, Arghakhanchi, Baglung, Parbat, Kaski and Manang | Alternative Energy Promotion Center (AEPC) |
• Preparation of District Energy plan (Field visit, data collection, data analysis, scenario development, Energy plan) |
| 42 | Third party monitoring verification of installed solar energy systems appliances like solar tuki , solar home systems, mobile charging stations and solar camp lights | 2015 June- 2015 July | Dokaha, Sundhupalchowk and Ramechhap | Alternative Energy Promotion Center (AEPC) / NRREP |
• Field visit for the verification of Solar tuki, Mobile Charging station that has been promoted during earthquake victim |
| 43 | Detail engineering study and design of water supply and sanitation project | June 2015- July 2015 | Nepal | Water Supply and Senitation Division Office , Nuwakot |
• Detailed engineering survey and design of water treatment plants of the project |
| 44 | Baseline and feasibility assessment of the waste to energy projects for potential financing under market/non market mechanism | 11th June 2015- 16th July 2015 | Nepal | Alternative Energy Promotion Center (AEPC) / NRREP |
• Review of policy of waste to energy project, feasibility assessment of for potential financing under market/non market mechanism |
| 45 | Design and prepare manuals of biogas appliances and conduct training for biogas appliances manufacturers | 7th June 2015- 16th July 2015 | Nepal | Alternative Energy Promotion Center (AEPC) / NRREP |
• Design and prepare manuals of biogas appliances and conduct training for biogas appliances manufacturers |
| 46 | Detail Feasibility Study of Mugre Khola MHP, Lamjung | June 2015- July 2015 | Lamjung | AEPC |
• Field visit, survey, design, drawing, cost estimate |
| 47 | Preparation District Climate and Energy Plan | April 2014- August 2014 | Gorkha,Palpa, Rupandehi, Kapilbastu, Syangja, Arghakhanchi, Baglung, Parbat,Kaski and Manang | AEPC/ NRREP |
• Outline energy needs for district, interventions of renewable energy technologies and GESI issues • Carry out resource, technology, and institutional assessments • Identification of the capacity development needs to implement the climate change adaptive renewable energy plan • Preparation of guideline for the implementation of plan |
| 48 | Preparation District Climate and Energy Plan | 23rd April 2014- 31st August 2014 | Jumla, Dailekh, Jajarkot, Dang, Bardiya and Pyuthan | AEPC/ NRREP |
• Outline energy needs for district, interventions of renewable energy technologies and GESI issues • Carry out resource, technology, and institutional assessments • Identification of the capacity development needs to implement the climate change adaptive renewable energy plan • Preparation of guideline for the implementation of plan |
| 49 | Conduct feasibility study of Energy Hub with field visit of different places and develop strategy for the operation of hub | 1st July 2014- 30th August 2014 | Nepal | AEPC/ NRREP |
• Study existing mechanism for subsidy processing and administration • Conduct focused group discussions • Identify gaps in existing RE service delivery modality including identifying opportunities for improving them. • Calculate costs of establishing energy hubs including setup, HR costs and tentative activities costs. • Develop strategy for the operation of hub |
| 50 | Conduct a study on biogas appliance workshops and organize a workshop for Enhancing efficiency of biogas stoves in Nepal | 15th June 2014- 29th July 2014 | Nepal | AEPC |
• Perform experiment and conduct training for manufacturer to increase efficiency of biogas stove |
| 51 | Verification of Biogas Plants constructed in F. Y. 2069-2070 with relation to Subsidy Disbursement by the independent verifier/s | 12th January 2014- 28th February 2014 | Nepal | AEPC |
• Field visit and reporting |
| 52 | Monitoring and Verification of Biogas Plants constructed in F. Y. 2069-2070 with relation to Subsidy Disbursement by the independent verifier/s | January 12, 2014 – February 28, 2014 | Nepal | AEPC/ NRREP |
• Inspection and monitoring of the plants in accordance to the prescribed format of monitoring. • Collect necessary documents/evidences to prove the deviations |
| 53 | Detail Feasibility Study of Chhote Khola MHP, Lamjung | Lamjung | AEPC |
• Field visit, survey, design, drawing, cost estimate |
|
| 54 | Detail Feasibility Study of Nerso Urkmi Khola MHP, Lamjung | Lamjung | AEPC |
• Field visit, survey, design, drawing, cost estimate |
|
| 55 | Detail Feasibility Study of Gwari Baluwa Khola Pyuthan and Jang Khola Rolapa | Rolapa Pyuthan | DOI, Jawalakhel, Ktm |
• Feasibility study of water project |
|
| 56 | Conduction of rapid assessment and gap analysis for achieving the main objectives of UN SE4ALL | December 24, 2012 – February 23, 2013 | Nepal | AEPC/ NRREP |
• A brief look of the energy situation in Nepal, A good estimate of the main challenges and opportunities vis-à-vis the three goals of SE4ALL, development of action plan |
| 57 | Preparation of handbook and conduction of solar technician (Level I, II and operation and maintenance) FY 2018/19 | August 16, 2016 – November 15, 2016 | Nepal | AEPC/NRREP |
• Preparation of manuals, curriculum and handbook for the training activities • Conduction of training for 9 batches of trainee in Kathmandu, Pokhara, Chitwan and Itahari • Evaluation and certification of trainee • Preparation of training report and final report |
| 58 | Improved cook stove fabrication training (FY 2019/20) | Afghanistan | UNDP | ||
| 59 | Preparation of guidelines for testing of passive solar technologies (Solar dryer and solar cookstoves) in Nepal | Nepal | Nepal Academy of Science & Technology |
Looking for Professional Consulting Services?
Contact Multiscope Solution Pvt. Ltd. to discuss your next project or assignment.
Contact Us